1970/01/01
NIS 2: BSAE Technologies Now Defined as Critical Infrastructure
Two BSAE Projects Signed for the Czech Republic with a Combined Output of 13.2 MW / 29.4 MWh
Project M1: 200 Units Sold, Now with FW 4.01
Last container for LG - BSAE 10MW / 29.4 MWh has arrived
LEX OZE III Approved: A New Era for Stand-Alone Batteries
Delivery of a 30MWh Battery System Commenced
BSAE Efficiency – A New Standard in Energy Storage